Yes, cloud prices went up in 2026, and the increases we recorded came from the providers people pick because they are cheap. Hetzner raised prices on 1 April and again on 15 June. OVHcloud put its average rise at 9% to 11% and then started billing IPv4 addresses and local disks separately. Fly.io, DigitalOcean (GPUs), Alibaba Cloud (AI compute), Netlify and Render changed their pricing too. Most of them named the same cause: the cost of memory and storage hardware.
Most developers assume cloud prices only fall. Our records of provider announcements, kept with a date and a link for each of the 80 providers we track, show 2026 breaking that habit. We list every price change we recorded this year, what drove it, and which customers each one reached. The last part matters most: whether you were hit depended less on your provider than on whether you were already running.
Every price change in 2026, in date order
All entries come from the provider's own announcement, as recorded in our change log.
| Date | Provider | What changed |
|---|---|---|
| 1 April | Hetzner | Prices raised for new orders and existing products |
| 1 April | OVHcloud | New prices for Public Cloud instances, VPS and Bare Metal; average 9% to 11% for 2026 to 2028 deployments |
| 14 April | Netlify | Credit-based Pro plan; bandwidth went from 10 to 20 credits per GB |
| 16 April | UpCloud | New Starter and Premium plans; older plans closed to new deployments |
| 18 April | Alibaba Cloud | AI compute and CPFS for Lingjun prices adjusted, citing hardware costs |
| 23 April | Render | Flat workspace plans; smaller bandwidth allowance on Hobby and Pro |
| 1 June | Exoscale | A40 GPU instances in Frankfurt 30% cheaper |
| 15 June | Hetzner | Monthly prices raised for new orders and rescales of dedicated servers and cloud plans |
| 1 July | Akamai Cloud (Linode) | G8 dedicated, GPU plans and extra IPv4 billed by the hour with no monthly cap |
| 1 August | DigitalOcean | On-demand and 12-month reserved GPU Droplet prices updated |
| 1 October | Fly.io | Machine RAM billed at $6.00 per GB per month; CPU unchanged |
| 1 October | OVHcloud | IPv4 and local storage billed separately on Gen 3 instances; totals up 1.4% to 21.9% |
| 10 November | Hetzner | Helsinki cloud servers 15% cheaper |
| 1 December | Cloudflare | Observability pricing takes effect for Workers Logs and Traces |
Each provider's timeline, with its own wording, is on its price history page, for example Hetzner's price history and DigitalOcean's price history.
Why: memory got expensive
The common thread is memory. OVHcloud gave the most detailed explanation in its pricing post (opens in a new tab): memory manufacturers shifted production toward GPUs for AI and high-bandwidth workloads while demand for RAM and storage stayed high. Its post said RAM and storage prices "could increase by 15% to 300%" compared with 2025, and projected RAM up 250% to 300% by the end of 2026 against September 2025. Providers order hardware up to 12 months ahead without knowing the final price.
Hetzner's wording was shorter. In February it said that the costs to run its infrastructure and to buy new hardware had both "increased dramatically". In May it cited "a massive increase in procurement costs" in its June price adjustment notice (opens in a new tab). Alibaba Cloud also cited higher hardware procurement costs for its AI compute change.
You can see the memory story in how the changes are built. Fly.io's update set a RAM rate of $6.00 per GB per month and left Machine CPU prices unchanged. OVHcloud capped renewals of options at +15% for RAM and +10% for disks, a higher ceiling for memory. Pricing memory as its own line lets a provider pass component costs through without touching the CPU price.
The quieter increase: unbundling
Not every rise shows up as a higher plan price. Several providers kept the headline number and started billing a part that used to be included.
OVHcloud's October change kept the hourly price of its Generation 3 instances (B3, C3, R3) the same and moved the public IPv4 address (about EUR 1.97 a month) and local storage (about EUR 0.11 per GB-month) onto their own lines. The total for an identical setup rose by 1.4% to 21.9%, as the OVHcloud provider page records. The worst case in its table was the c3-4, from EUR 33 to EUR 41 a month.
Akamai removed the monthly cap for some services on 1 July: G8 dedicated plans, GPU plans and additional IPv4 addresses are billed for every hour used, while other services keep the cap. DigitalOcean already lists the IPv4 address of v5 Droplets as its own invoice line, priced at $0.00 and "subject to change".
This matters for comparisons, because a price table that shows only the plan price misses it. We track these line items on each provider's cost label, and the guide to hidden cloud server costs lists what each provider charges for IPv4, disks, backups and snapshots today.
Platforms repriced through credits and allowances
On hosting platforms, the change came through units that are hard to compare. Netlify's April plan made seats free, set Pro at $20 a month for 3,000 credits, and changed the credit rates: bandwidth from 10 to 20 credits per GB, compute from 5 to 10 credits per GB-hour, and web requests from 3 to 2 credits per 10,000. A team with one seat and heavy traffic now spends credits twice as fast on bandwidth. A team with many seats and little traffic saves on seats.
Render's new workspace plans replaced per-member pricing with flat fees (Pro at $25 a month, Scale at $499) and cut the bandwidth allowance on Hobby and Pro. Render's outbound transfer beyond the allowance is $0.15 per GB, so a smaller allowance hits traffic-heavy apps first. Compare Heroku and Render's cost labels to see each one's allowance and rate.
Not everything went up
Three changes went the other way. Exoscale cut its A40 GPU instances in Frankfurt by 30% on 1 June, from 1.4933 to 1.0453 per hour for the one-GPU size, and running instances got the new price automatically. Hetzner made cloud servers in Helsinki 15% cheaper on 10 November for its CPX and CCX lines, for new orders and rescales; German locations were unchanged. Fly.io's own example showed a Sprite running flat out on 2 vCPU and 4 GB falling from $226.80 to $118.08 a month.
GPU prices are spread so wide that a single change says little about the market. Our guide to cloud GPU pricing shows the same H100 listed from $1.73 to $12.29 per GPU-hour on one day.
Who was protected: new orders vs existing servers
The biggest factor in whether a 2026 increase reached you was the existing-customer clause.
| Change | Existing customers |
|---|---|
| Hetzner, 1 April | Affected: the change applied to new orders and existing products |
| Hetzner, 15 June | Not affected: "Currently rented servers are not affected"; rescales pay the new price |
| OVHcloud, 1 April | New prices at the end of the current contract term; services renewed before 1 April kept the rate for up to 2 years |
| Alibaba Cloud, 18 April | Existing purchases keep their billing cycle and move at the next renewal |
| Render, 23 April | Could opt in until 1 August 2026, when workspaces still on legacy plans were scheduled to move automatically |
| DigitalOcean, 1 August | Locked reserved contracts unchanged until renewal; on-demand workloads billed at the new rate |
Two habits follow from that table. A rescale counts as a new order at Hetzner, so resizing a server during a price change can cost you the old rate. And where a provider offers a term or reserved contract, the term protected customers in 2026 at OVHcloud and DigitalOcean.
The steepest increase is a shutdown
A price rise costs you a percentage. A shutdown costs you a migration. Several services ended or announced their end in 2026, each recorded on the retirement calendar:
- Equinix Metal ended on 30 June 2026; new resources can no longer be created.
- Zeabur is shutting down its dedicated servers and shared clusters by 31 December 2026.
- Deno Deploy announced on 9 October 2026 that it will run for six more months; the Deno site gives April 2027.
- Hostinger shuts down its OpenVZ VPS plans on 14 December 2026 and removes remaining servers and data.
- Akamai retires its Distributed Compute regions on 31 December 2026; services left in them are permanently deleted.
The Equinix Metal profile and Zeabur profile keep the provider's own wording and replacement advice.
How to keep track without checking every pricing page
Prices on this site come with the date they were checked, and changes land in one place:
- Watch the change log and its Atom feed for new announcements and catalog price moves.
- Lock the plans you run in a stack lockfile; it compares them against the latest data and shows price moves, retirements and cost label changes.
- Use the Compute Price Index to see whether a provider's prices drift once more runs exist. It has one run so far (17 November 2026), so it cannot yet show change.
If you are weighing a move because of a price rise, compare like for like: Hetzner vs OVHcloud and Hetzner vs Scaleway lay out every sourced fact, and our guide to where AWS really costs more than a VPS shows how much of the gap is bandwidth. More guides are on the guides page.
In 2026 the cheap clouds stopped absorbing hardware costs, and one clause about existing customers decided who paid.
Questions and answers
- Did Hetzner raise prices in 2026?
- Yes, twice. From 1 April 2026 Hetzner raised prices for new orders and existing products, citing infrastructure and hardware costs. From 15 June 2026 it raised monthly prices again for new orders and rescales of dedicated servers and cloud plans; existing servers kept their terms. On 10 November 2026 it cut Helsinki cloud server prices by 15%.
- Why are cloud prices going up in 2026?
- The reason most providers give is hardware, above all memory. OVHcloud wrote that RAM and storage prices could rise 15% to 300% compared with 2025, as memory makers shift production toward AI hardware. Hetzner cited a massive increase in procurement costs.
- How much did OVHcloud prices increase?
- OVHcloud put the average rise at 9% to 11% for cloud deployed from 2026 to 2028 and 2% to 6% for older deployments, applied at the end of each contract term. From 1 October 2026 it also started billing the IPv4 address and local storage separately on Generation 3 instances, raising the total by 1.4% to 21.9% by size.
- Do price increases apply to servers I already run?
- It depends on the provider. Hetzner's April 2026 change applied to existing products, its June change did not. OVHcloud applies new prices at the end of the current contract term, and DigitalOcean kept locked reserved GPU rates until renewal. Read the announcement for the existing-customer clause.
- Did any cloud provider cut prices in 2026?
- Yes. Exoscale cut its A40 GPU instances in Frankfurt by 30% on 1 June 2026, from 1.4933 to 1.0453 per hour for the one-GPU size. Hetzner made Helsinki cloud servers 15% cheaper on 10 November 2026, and Fly.io's example Sprite workload fell from $226.80 to $118.08 a month.
Sources
Figures are read from these provider pages and from the sourced tables on this site.
- Hetzner statement on price adjustment (April 2026) (opens in a new tab)
- Hetzner standardization and price adjustment of server products (June 2026) (opens in a new tab)
- Hetzner price reduction for Helsinki cloud servers (opens in a new tab)
- OVHcloud pricing evolution of Public Cloud, Bare Metal and VPS (opens in a new tab)
- OVHcloud Public Cloud pricing update, October 2026 (opens in a new tab)
- Fly.io 2026 pricing update (opens in a new tab)
- DigitalOcean GPU price changes (opens in a new tab)
- Netlify pricing updates, April 2026 (opens in a new tab)
- Render updated workspace plans (opens in a new tab)
- Alibaba Cloud price adjustment for AI compute and storage (opens in a new tab)
- Exoscale A40 GPU price reduction (opens in a new tab)
- Akamai Cloud billing (opens in a new tab)
Spotted a number that is out of date? Tell us on the contact page and we will correct it. How we collect and check prices is on the methodology page.