What changed in the compute catalog and on this site, newest first: plans added, removed or repriced, provider announcements and corrections.

Latest entry

Catalog prices fetched: AWS ; Azure ; Google Cloud ; Vultr ; Linode ; DigitalOcean

entries
149
days with changes
26

Where can I see recent cloud price and plan changes?

The change log holds 149 dated entries (plans and regions added or removed, provider announcements, retirements and corrections), the latest on 2026-11-17; no catalog price change has been found between snapshots yet. It is also an Atom feed.

Computed from the data on this site, not written by hand. Data checked .

Atom feed of the latest 250 entries. Plan changes are found when the catalog is refreshed by comparing the new snapshot with the previous one, so an entry is dated by the snapshot that first showed it, which can be later than the provider's own change. Announcements and corrections keep the date the source gives. Retirement calendar entries are dated by the day we checked the provider's page; the retirement date is in the entry, and the full list is on the retirement calendar. Method: Methodology. Corrections to facts on this site are also listed in the corrections log.

  • Region added to catalogGoogle Cloud: region Singapore (asia-southeast1) added to the catalog

    368 plans. This widens what the catalog covers; it is not a change by the provider.

    Source (opens in a new tab)/compute

  • Region added to catalogGoogle Cloud: region Belgium (europe-west1) added to the catalog

    361 plans. This widens what the catalog covers; it is not a change by the provider.

    Source (opens in a new tab)/compute

  • Region added to catalogGoogle Cloud: region South Carolina (us-east1) added to the catalog

    368 plans. This widens what the catalog covers; it is not a change by the provider.

    Source (opens in a new tab)/compute

12 entries: Vultr: plan removed
  • Plan removedVultr: plan voc-c-32c-64gb-1000s-amd no longer listed in Frankfurt (fra)

    32 vCPU, 64 GiB. It was listed at $720.00 per month ($0.986 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-c-32c-64gb-500s-amd no longer listed in Frankfurt (fra)

    32 vCPU, 64 GiB. It was listed at $640.00 per month ($0.877 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-g-24c-96gb-480s-amd no longer listed in Frankfurt (fra)

    24 vCPU, 96 GiB. It was listed at $720.00 per month ($0.986 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-g-32c-128gb-640s-amd no longer listed in Frankfurt (fra)

    32 vCPU, 128 GiB. It was listed at $960.00 per month ($1.32 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-g-40c-160gb-768s-amd no longer listed in Frankfurt (fra)

    40 vCPU, 160 GiB. It was listed at $1,200.00 per month ($1.64 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-m-24c-192gb-1200s-amd no longer listed in Frankfurt (fra)

    24 vCPU, 192 GiB. It was listed at $960.00 per month ($1.32 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-m-24c-192gb-2400s-amd no longer listed in Frankfurt (fra)

    24 vCPU, 192 GiB. It was listed at $1,175.00 per month ($1.61 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-m-24c-192gb-4800s-amd no longer listed in Frankfurt (fra)

    24 vCPU, 192 GiB. It was listed at $1,500.00 per month ($2.06 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-m-32c-256gb-1600s-amd no longer listed in Frankfurt (fra)

    32 vCPU, 256 GiB. It was listed at $1,280.00 per month ($1.75 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan voc-m-32c-256gb-3200s-amd no longer listed in Frankfurt (fra)

    32 vCPU, 256 GiB. It was listed at $1,565.00 per month ($2.14 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan vx1-g-16c-64g-960s no longer listed in New Jersey (ewr)

    16 vCPU, 64 GiB. It was listed at $446.76 per month ($0.612 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Plan removedVultr: plan vx1-m-16c-128g-960s no longer listed in New Jersey (ewr)

    16 vCPU, 128 GiB. It was listed at $563.56 per month ($0.772 per hour). The provider's price source no longer returns it.

    Source (opens in a new tab)/compute

  • Provider announcementCloudflare: upcoming change

    Takes effect December 1, 2026. Cloudflare Observability pricing takes effect. Workers Logs, Workers Traces and other datasets share one allowance: Free gets 0.5 GB of ingestion per day with seven-day retention; Paid gets 50 GB of ingestion and 10 GB-month of storage per billing cycle, then $0.25 per GB ingested and $0.10 per GB-month stored.

    Source (opens in a new tab)/providers/cloudflare

  • Retirement calendarAlibaba Cloud: Classic network. Reached end of life on February 28, 2025

    Alibaba Cloud ended its classic network: remaining pay-as-you-go and expired subscription resources were stopped and released on 28 February 2025. Resources in VPCs are not affected. The provider points to: VPC.

    Source (opens in a new tab)/retirements#r-alibaba-classic-network

  • Retirement calendarAlibaba Cloud: ECS s6, n4, mn4, xn4 and e4 instance families. End of sale on October 30, 2023

    Alibaba Cloud ended sales of the s6, n4, mn4, xn4 and e4 ECS instance families from 30 October 2023; existing instances keep running.

    Source (opens in a new tab)/retirements#r-alibaba-ecs-s6-n4-mn4-xn4-e4

9 entries: AWS: retirement calendar
16 entries: Azure: retirement calendar
  • Retirement calendarCivo: Managed PostgreSQL 14. Reached end of life on November 12, 2026

    Civo's managed database service ends support for PostgreSQL 14 on this date and recommends moving to PostgreSQL 17. The provider points to: PostgreSQL 17.

    Source (opens in a new tab)/retirements#r-civo-postgresql-14

  • Retirement calendarDeno Deploy: Deno Deploy. Shuts down in April 2027

    Deno Land announced on October 9, 2026 that Deno Deploy will continue operating for six months before shutting down; the Deno site banner gives April 2027. The provider points to: Cloudflare Workers (migration support for paying customers). Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-deno-deploy-shutdown

  • Retirement calendarDigitalOcean: Previous Basic Droplet plans with Premium CPUs. Deprecated on August 2, 2023

    DigitalOcean replaced the previous Premium CPU Basic Droplet plans with new vCPU:RAM ratios; the old plans left the control panel but remain available through the API and CLI. The provider points to: New Basic Droplet Premium CPU plans.

    Source (opens in a new tab)/retirements#r-digitalocean-basic-premium-droplet-previous-plans

  • Retirement calendarDigitalOcean: PostgreSQL and MySQL Standard Edition plans above 4 GiB RAM. Deprecated on November 30, 2026

    From this date for all accounts, Standard Edition PostgreSQL and MySQL no longer offer plans above 4 GiB RAM or standby and read-only nodes; existing clusters are not affected. The provider points to: Advanced Edition (Basic - Shared CPU plans with 8 GiB to 64 GiB RAM). Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-digitalocean-db-standard-edition-plans

  • Retirement calendarDigitalOcean: Managed Caching. Shut down on June 30, 2025

    DigitalOcean discontinued Managed Caching on this date; Caching clusters convert to Valkey clusters by then. The provider points to: Managed Valkey.

    Source (opens in a new tab)/retirements#r-digitalocean-managed-caching

  • Retirement calendarDigitalOcean: Managed MySQL 8.0. Reached end of life on October 30, 2026

    MySQL 8.0 reaches end of life on this date and existing managed MySQL 8.0 clusters are force-upgraded to MySQL 8.4 in each cluster's maintenance window. The provider points to: MySQL 8.4.

    Source (opens in a new tab)/retirements#r-digitalocean-managed-mysql-8-0

  • Retirement calendarEquinix Metal: Equinix Metal. Reached end of life on June 30, 2026

    Equinix announced end-of-sale and end-of-life for Equinix Metal on 7 November 2024 and ended the service on 30 June 2026; new resources can no longer be created. The provider points to: Equinix Colocation or Equinix Managed Solutions.

    Source (opens in a new tab)/retirements#r-equinix-metal

  • Retirement calendarExoscale: Exoscale API v1 (CloudStack based). Deprecated on May 1, 2024

    Exoscale deprecated its CloudStack based API v1 on this date; calls must use the zone-specific API v2 endpoints. The provider points to: API v2.

    Source (opens in a new tab)/retirements#r-exoscale-api-v1

  • Retirement calendarFly.io: Hobby, Launch and Scale plans. End of sale on October 7, 2024

    Fly.io stopped selling the Hobby, Launch and Scale plans on this date; existing customers on Launch or Scale can stay on them until they convert to Pay As You Go or stop using Fly.io. The provider points to: Pay As You Go.

    Source (opens in a new tab)/retirements#r-fly-hobby-launch-scale-plans

  • Retirement calendarFly.io: LiteFS Cloud. Shut down on October 15, 2024

    Fly.io retired the LiteFS Cloud backup service; LiteFS itself is not affected. The provider points to: Other disaster recovery options for LiteFS described by Fly.io.

    Source (opens in a new tab)/retirements#r-fly-litefs-cloud

  • Retirement calendarHeroku: Heroku-20 stack. Reached end of life on May 1, 2025

    Heroku-20 (Ubuntu 20.04) reached end-of-life; existing apps keep running but no new builds can be deployed until the app moves to a newer stack. The provider points to: A more recent stack such as Heroku-24.

    Source (opens in a new tab)/retirements#r-heroku-20-stack-eol

  • Retirement calendarHeroku: Heroku-22 stack. Reaches end of life on April 30, 2027

    Heroku-22 (Ubuntu 22.04) reaches end-of-life on April 30, 2027; existing apps keep running but the stack no longer gets security updates. The provider points to: Heroku-24 or Heroku-26 stack. Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-heroku-22-stack-eol

  • Retirement calendarHeroku: Apache Kafka on Heroku 2.8 and 3.7. Reached end of life on October 28, 2026

    Heroku set October 28, 2026 as the end-of-life date for Apache Kafka on Heroku versions 2.8 and 3.7; clusters are then restricted and deleted. The provider points to: The latest Apache Kafka on Heroku version.

    Source (opens in a new tab)/retirements#r-heroku-kafka-2-8-3-7-eol

  • Retirement calendarHeroku: Heroku Postgres 13. Reached end of life on October 29, 2024

    Heroku Postgres version 13 reached its listed end-of-life date; databases on deprecated versions are restricted and deleted for non-compliance after that date. The provider points to: A newer supported Postgres version.

    Source (opens in a new tab)/retirements#r-heroku-postgres-13-eol

  • Retirement calendarHeroku: Heroku Postgres 14. Reached end of life on November 28, 2025

    Heroku Postgres version 14 reached end-of-life on this date; Heroku takes action on remaining Postgres 14 databases for non-compliance. The provider points to: A newer supported Postgres version.

    Source (opens in a new tab)/retirements#r-heroku-postgres-14-eol

  • Retirement calendarHeroku: Heroku Postgres 15. Reaches end of life on February 28, 2027

    Heroku will start restricting access to and deleting Postgres 15 databases after this end-of-life date; forced upgrades start January 28, 2027. The provider points to: A newer supported Postgres version. Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-heroku-postgres-15-eol

  • Retirement calendarHeroku: Heroku Postgres mini and basic plans. Reached end of life on May 29, 2024

    Heroku set the end-of-life date for the mini and basic Heroku Postgres plans at May 29, 2024 (corrected from an earlier stated date). The provider points to: Essential-tier Heroku Postgres plans.

    Source (opens in a new tab)/retirements#r-heroku-postgres-mini-basic-plans

  • Retirement calendarHeroku: Valkey 7 on Heroku Key-Value Store. Reaches end of life on February 19, 2027

    Heroku moved the end-of-life date for Valkey 7 instances on Heroku Key-Value Store to February 19, 2027; forced upgrades start January 19, 2027. The provider points to: A newer Valkey version. Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-heroku-valkey-7-eol

  • Retirement calendarHetzner: Old Cloud servers CCX12 to CCX62 (dedicated AMD vCPUs). End of sale on September 27, 2023

    Hetzner stopped taking orders for the old dedicated AMD vCPU plans (CCX12 to CCX62) on this date; existing servers are not affected. The provider points to: New AMD vCPU server plans (rescale option).

    Source (opens in a new tab)/retirements#r-hetzner-ccx-amd-dedicated-old

  • Retirement calendarHetzner: Cloud servers CCX11 to CCX51 (dedicated Intel vCPUs). End of sale on July 18, 2023

    Hetzner stopped taking orders for its dedicated Intel vCPU Cloud server plans (CCX11, CCX21, CCX31, CCX41, CCX51) on this date; existing servers keep running. The provider points to: Server plans with AMD vCPUs (rescale option).

    Source (opens in a new tab)/retirements#r-hetzner-ccx-intel-dedicated

  • Retirement calendarHetzner: Cloud servers CPX11 to CPX51 (shared AMD vCPUs). End of sale on January 1, 2026

    Hetzner stopped taking orders for CPX11, CPX21, CPX31, CPX41 and CPX51 in FSN, NBG, HEL and SIN on this date; existing servers are not affected. The provider points to: Newer CPX plans (CPX12 to CPX62) via the rescale option.

    Source (opens in a new tab)/retirements#r-hetzner-cpx-shared-amd-gen1

  • Retirement calendarHetzner: Cloud servers CX11 to CX51 (shared Intel vCPUs). End of sale on September 6, 2024

    Hetzner stopped taking orders for the old shared Intel vCPU plans (CX11, CX21, CX31, CX41, CX51) on this date; existing servers keep working. The provider points to: New server plans with Intel vCPUs (rescale option).

    Source (opens in a new tab)/retirements#r-hetzner-cx-shared-intel-gen1

  • Retirement calendarHetzner: Cloud servers CX22 to CX52 (shared Intel vCPUs). End of sale on January 1, 2026

    Hetzner stopped taking orders for CX22, CX32, CX42 and CX52 on this date and removes them from the API list endpoint; existing servers are not affected. The provider points to: Newer CX plans (CX23, CX33, CX43, CX53) via the rescale option.

    Source (opens in a new tab)/retirements#r-hetzner-cx22-cx52-shared-intel

  • Retirement calendarHetzner: Debian 11 image for Cloud servers. Deprecated on November 30, 2026

    Hetzner will stop offering the debian-11 image when creating new servers after this date. Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-hetzner-image-debian-11

  • Retirement calendarHetzner: Fedora 43 image for Cloud servers. Deprecated on February 12, 2027

    Hetzner will stop offering the fedora-43 image when creating new servers after this date. Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-hetzner-image-fedora-43

  • Retirement calendarHostinger: OpenVZ VPS plans. Shuts down on December 14, 2026

    Hostinger stopped renewals and upgrades of OpenVZ VPS plans on 1 March 2026 and shuts OpenVZ down on this date, after which remaining servers and data are removed. The provider points to: KVM VPS (manual migration). Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-hostinger-openvz-vps

  • Retirement calendarLambda: Lambda on-premise hardware (Vector workstations, Scalar and Hyperplane servers). End of sale on August 29, 2025

    Lambda ended its on-premise hardware business as of this date and recommends its cloud products. The provider points to: Lambda cloud products.

    Source (opens in a new tab)/retirements#r-lambda-on-premise-hardware

  • Retirement calendarNeon: Azure regions (azure-eastus2, azure-westus3, azure-gwc). Deprecated on April 7, 2026

    Neon deprecated its Azure regions on this date: new projects cannot be created there, existing projects keep running, and from October 5, 2026 the regions no longer receive new Neon features. The provider points to: Neon AWS regions, or Databricks Lakebase for Postgres data that must stay in Azure.

    Source (opens in a new tab)/retirements#r-neon-azure-regions

  • Retirement calendarNetlify: Post-processing asset optimization. Reached end of life on October 17, 2023

    Netlify ended its built-in asset optimization (CSS and JavaScript bundling and minification, image compression at build time) on this date.

    Source (opens in a new tab)/retirements#r-netlify-asset-optimization

  • Retirement calendarNetlify: Legacy built-in prerendering. Shut down on March 17, 2026

    Netlify's legacy prerendering feature was shut down in stages from January 20 to March 17, 2026, ending with Enterprise and specialized plans. The provider points to: Netlify Prerender extension.

    Source (opens in a new tab)/retirements#r-netlify-legacy-prerendering

  • Retirement calendarNetlify: Netlify Visual Editor. Reaches end of life on February 8, 2027

    Netlify deprecated Visual Editor on November 10, 2026 (no new teams or projects can enable it) and ends it on February 8, 2027. The provider points to: Netlify Agent Runners. Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-netlify-visual-editor

  • Retirement calendarRender: Render Postgres 12. Reached end of life on November 14, 2024

    Render moved PostgreSQL 12 to legacy support ahead of the community end-of-life on November 14, 2024 and stopped new PostgreSQL 12 databases for workspaces that did not already have one. The provider points to: A supported PostgreSQL version via in-place upgrade.

    Source (opens in a new tab)/retirements#r-render-postgres-12-legacy

  • Retirement calendarReplicate: Models built with Python 3.7. Reached end of life on November 15, 2024

    Replicate stopped running models built with Python 3.7 on Friday November 15 (12:00 PM UTC); requests to affected models return a 400-level error. The provider points to: Rebuild the model with a newer Python version.

    Source (opens in a new tab)/retirements#r-replicate-python-3-7-models

  • Retirement calendarVercel: Node.js 18 on Vercel Builds and Functions. Deprecated on September 1, 2025

    Vercel disabled Node.js 18 in project settings on this date; existing deployments keep running but new deployments on Node.js 18 error. The provider points to: Node.js 22 or newer.

    Source (opens in a new tab)/retirements#r-vercel-node-18

  • Retirement calendarVercel: Node.js 20 on Vercel Builds and Functions. Deprecated on October 1, 2026

    Vercel disabled Node.js 20 in project settings on this date; already-deployed functions keep working but new deployments on Node.js 20 error. The provider points to: A newer Node.js version, or a container deploy with Dockerfile.vercel.

    Source (opens in a new tab)/retirements#r-vercel-node-20

  • Retirement calendarVultr: Ubuntu 25.04 image. Reached end of life on January 15, 2026

    Vultr notes Ubuntu 25.04 reaches end of life on this date and stops receiving security updates or maintenance. The provider points to: A supported Ubuntu LTS or interim release.

    Source (opens in a new tab)/retirements#r-vultr-ubuntu-25-04

  • Retirement calendarZeabur: Zeabur platform (dedicated servers and shared clusters). Shuts down on December 31, 2026

    Zeabur is winding down: some services start shutting down on December 1, 2026 and all dedicated servers and shared clusters are shut down by December 31, 2026. Added to the retirement calendar.

    Source (opens in a new tab)/retirements#r-zeabur-shutdown

21 entries: Site: correction
  • CorrectionCorrection: /blog/aws-vs-gcp-vs-azure-cloud-comparison-guide

    Retitled the guide that was called "The 2025 Cloud Comparison Guide" although its figures were checked in November 2026. The old address now redirects to the new one.

    /blog/aws-vs-gcp-vs-azure-cloud-comparison-guide

  • CorrectionCorrection: /comparison/do-vs-vultr

    Vultr's plans API also lists a free instance. Vultr's Free Tier program page says it is by application, admitted at random in limited quantities, and available only in Miami, Seattle and Frankfurt, so it is not open to every account. The entry price stays at $2.50 per month (IPv6 only) and $3.50 per month with IPv4, now sourced to Vultr's pricing page, and the free instance is shown as a separate qualified line.

    Source (opens in a new tab)/comparison/do-vs-vultr

  • CorrectionCorrection: /comparison/heroku-vs-render

    Added the same Heroku sustaining engineering status to the cons, quick verdict, recommendation and sources of this comparison.

    Source (opens in a new tab)/comparison/heroku-vs-render

  • CorrectionCorrection: /comparison/heroku-vs-render

    The Render con now reads "Autoscaling needs a Pro workspace or higher ($25/month flat)" and the sources list Render's April 2026 workspace plan change.

    Source (opens in a new tab)/comparison/heroku-vs-render

  • CorrectionCorrection: /comparison/hetzner-vs-linode

    Our pricing model line and summary said both providers bill hourly with a monthly cap. Akamai Cloud no longer caps G8 dedicated Linodes, GPU Linodes or additional IPv4 addresses since July 1, 2026, so the text now says most plans. The verdict also called the entry prices close although they are in EUR and USD; it now says they are in different currencies and not converted.

    Source (opens in a new tab)/comparison/hetzner-vs-linode

  • CorrectionCorrection: /providers/alibaba

    Added Alibaba Cloud's price adjustment for AI compute services and CPFS for Lingjun, effective April 18, 2026.

    Source (opens in a new tab)/providers/alibaba

  • CorrectionCorrection: /providers/cloudflare

    Added the Observability pricing that takes effect on December 1, 2026 (shared ingestion and storage allowance, then $0.25 per GB and $0.10 per GB-month on Paid).

    Source (opens in a new tab)/providers/cloudflare

  • CorrectionCorrection: /providers/digitalocean

    Added DigitalOcean's GPU Droplet repricing effective August 1, 2026.

    Source (opens in a new tab)/providers/digitalocean

  • CorrectionCorrection: /providers/exoscale

    Added the 30 percent cut for A40 (GPU3) instances in Frankfurt from June 1, 2026.

    Source (opens in a new tab)/providers/exoscale

  • CorrectionCorrection: /providers/fly

    Added Fly.io's pricing update effective October 1, 2026: Machine RAM at $6.00 per GB per month, CPU pricing unchanged.

    Source (opens in a new tab)/providers/fly

  • CorrectionCorrection: /providers/heroku

    Added Heroku's lifecycle status. Heroku announced on February 6, 2026 that it is moving to a sustaining engineering model with no new-feature priority; our profile did not say so.

    Source (opens in a new tab)/providers/heroku

  • CorrectionCorrection: /providers/hetzner

    Added three Hetzner price events that the profile and the Hetzner vs Akamai Cloud comparison did not mention: the price rise of 1 April 2026, the dedicated server standardization and price rise of 15 June 2026, and the 15 percent cut for Helsinki cloud servers from 10 November 2026. The EUR 5.49 entry price was re-checked on Hetzner's regular performance page and is unchanged.

    Source (opens in a new tab)/providers/hetzner

  • CorrectionCorrection: /providers/koyeb

    Koyeb's profile said only that it "announced it is joining Mistral AI". It now says completion is pending closing conditions, and the change list notes that new sign-ups are limited to Pro and above. Status stays active.

    Source (opens in a new tab)/providers/koyeb

  • CorrectionCorrection: /providers/koyeb

    Replaced "Over 50 locations" with what Koyeb's region reference lists: 6 core regions (Frankfurt, Washington D.C., Singapore, Tokyo, Paris, AWS US East) plus a San Francisco preview region for paid plans.

    Source (opens in a new tab)/providers/koyeb

  • CorrectionCorrection: /providers/linode

    Added the July 1, 2026 billing change: G8 dedicated Linodes, GPU Linodes and additional IPv4 addresses have no monthly price cap.

    Source (opens in a new tab)/providers/linode

  • CorrectionCorrection: /providers/netlify

    Added Netlify's April 14, 2026 change to the credit-based Pro plan: $20 per month for 3,000 credits with unlimited seats, free form submissions and new credit rates.

    Source (opens in a new tab)/providers/netlify

  • CorrectionCorrection: /providers/ovh

    Added OVHcloud's price changes of April 1, 2026 and October 1, 2026 (local storage and public IPv4 billed separately on Generation 3 Public Cloud instances).

    Source (opens in a new tab)/providers/ovh

  • CorrectionCorrection: /providers/render

    Added Render's new workspace plans of April 23, 2026 (Hobby, Pro $25 per month, Scale $499 per month). We re-checked the claim that autoscaling needs a Pro workspace: Render's scaling docs and pricing page still say so, so the claim stays, now with the Pro price.

    Source (opens in a new tab)/providers/render

  • CorrectionCorrection: /providers/upcloud

    Added UpCloud's April 16, 2026 plan change: Starter and Premium plans replaced the Developer, General Purpose, High CPU and High Memory plans for new deployments. Starter starts at EUR 3 per month, confirmed on UpCloud's pricing page.

    Source (opens in a new tab)/providers/upcloud

  • CorrectionCorrection: /providers/zeabur

    Added two Zeabur product changes: the shared cluster stopped accepting new projects on February 23, 2026, and AI Hub was shut down on September 22, 2026.

    Source (opens in a new tab)/providers/zeabur

  • CorrectionCorrection: /providers

    Added the missing official pricing links for UpCloud, Ravion and TensorWave. CUDO Compute and Fluidstack still have none because their sites show no public prices.

    /providers

  • Provider announcementHetzner: announced change

    Cloud servers in Helsinki (HEL1) became 15% cheaper for the Regular Performance (CPX) and General Purpose (CCX) lines, for new orders and rescales. Existing servers and German locations are unchanged.

    Source (opens in a new tab)/providers/hetzner

  • Provider announcementLatitude.sh: announced change

    Latitude.sh launched File Storage, shared NFS filesystems for bare metal servers at $0.08/GB per month, in Ashburn, Los Angeles, Chicago, New York, London and Tokyo.

    Source (opens in a new tab)/providers/latitude-sh

  • Provider statusDeno Deploy: status is deprecated

    Deno Land announced that Deno is joining Cloudflare and that Deno Deploy will continue operating for six months before shutting down; its site banner says it will be sunset in April 2027.

    Source (opens in a new tab)/providers/deno-deploy

  • Provider announcementLatitude.sh: announced change

    Latitude.sh made its Kubernetes service (LKS) available, with a managed control plane and bare metal nodes, in Ashburn, Chicago, Dallas, Los Angeles and London.

    Source (opens in a new tab)/providers/latitude-sh

  • Provider announcementLatitude.sh: announced change

    Latitude.sh launched Block Storage volumes that attach to servers, at $0.08/GB per month, in Ashburn, New York, Chicago, Los Angeles, London and Tokyo.

    Source (opens in a new tab)/providers/latitude-sh

  • Provider announcementFly.io: announced change

    Fly.io's 2026 pricing update took effect for Machines, Sprites and Managed Postgres. Machine RAM is billed at $6.00 per GB per month, up to 128 GB, and Machine CPU pricing is unchanged.

    Source (opens in a new tab)/providers/fly

  • Provider announcementOVHcloud: announced change

    Public Cloud instance prices change: the hourly price of the instance is the same, but local storage and the public IPv4 address, once included on Generation 3 instances (B3, C3, R3), are billed separately. For the same configuration the total rises 1.4% to 21.9% depending on size.

    Source (opens in a new tab)/providers/ovh

  • Provider announcementZeabur: announced change

    Zeabur shut down AI Hub after a security incident confirmed on August 28 and did not bring it back. Unused balances were returned as Zeabur credit, with cash refunds on request.

    Source (opens in a new tab)/providers/zeabur

  • Provider announcementDigitalOcean: announced change

    DigitalOcean updated on-demand and 12-month reserved prices for NVIDIA and AMD GPU Droplets. Workloads running on or after this date are billed at the new rate; contracts that lock a rate are unchanged until renewal.

    Source (opens in a new tab)/providers/digitalocean

  • Provider announcementAkamai Cloud (Linode): announced change

    G8 dedicated Linodes, GPU Linodes and additional IPv4 addresses are billed for the hours actually used, with no monthly price cap. Other services keep the monthly cap.

    Source (opens in a new tab)/providers/linode

  • Provider announcementHetzner: announced change

    Hetzner standardized its dedicated server product structure and raised monthly prices for new orders and rescales on dedicated servers and cloud plans at all locations. One-time setup fees fell for most dedicated servers. Existing servers keep their terms.

    Source (opens in a new tab)/providers/hetzner

  • Provider announcementExoscale: announced change

    A40 (GPU3) instances in Frankfurt became 30% cheaper. The Small size (1 GPU) went from 1.4933 to 1.0453 per hour, with one figure listed for EUR, CHF and USD. Running instances get the new price automatically.

    Source (opens in a new tab)/providers/exoscale

  • Provider announcementRender: announced change

    New workspace plans: Hobby (free), Pro ($25 per month flat) and Scale ($499 per month flat) replace the per-member Professional and Organization plans, with unlimited members and a smaller bandwidth allowance on Hobby and Pro. Compute pricing is unchanged. Existing workspaces could opt in until August 1, 2026, when any still on a legacy plan were scheduled to move automatically.

    Source (opens in a new tab)/providers/render

  • Provider announcementAlibaba Cloud: announced change

    Alibaba Cloud adjusted prices for AI compute services and CPFS for Lingjun, citing higher hardware procurement costs. Services bought before this date keep their current billing cycle and move to the new price at the next renewal.

    Source (opens in a new tab)/providers/alibaba

  • Provider announcementUpCloud: announced change

    UpCloud introduced Starter and Premium plans. Developer, General Purpose, High CPU and High Memory plans are no longer available for new deployments; existing deployments stay supported. Starter starts at EUR 3 per month for 1 vCPU, 1 GB of memory and 10 GB of storage, excluding local taxes.

    Source (opens in a new tab)/providers/upcloud

  • Provider announcementNetlify: announced change

    Credit-based Pro plan is $20 per month for 3,000 credits with unlimited team seats, where seats used to cost $20 each. Form submissions are free. Credit rates changed: bandwidth went from 10 to 20 credits per GB, compute from 5 to 10 credits per GB-hour, and web requests from 3 to 2 credits per 10,000.

    Source (opens in a new tab)/providers/netlify

  • Provider announcementNeon: announced change

    Neon deprecated its Azure regions (azure-eastus2, azure-westus3, azure-gwc): new projects can no longer be created there, and from October 5, 2026 they no longer receive platform updates.

    Source (opens in a new tab)/providers/neon

  • Provider announcementOVHcloud: announced change

    New prices for Public Cloud instances, VPS and Bare Metal, announced March 5, 2026 and tied to memory and storage costs. OVHcloud puts the average rise at 9% to 11% for cloud deployed from 2026 to 2028 and 2% to 6% for older deployments, applied at the end of the current contract term.

    Source (opens in a new tab)/providers/ovh

  • Provider announcementKoyeb: announced change

    Koyeb announced a definitive agreement to join Mistral AI. The announcement says completion is subject to closing conditions, and no completion notice appears on Koyeb's blog as of November 17, 2026. The platform keeps operating, new sign-ups are limited to the Pro plan and above, and existing organizations are unchanged.

    Source (opens in a new tab)/providers/koyeb

  • Provider statusHeroku: status is sustaining engineering

    Heroku says it is moving to a sustaining engineering model focused on stability, security, reliability and support, with no new-feature priority. Enterprise Account contracts are no longer offered to new customers; credit-card pricing and billing are unchanged.

    Source (opens in a new tab)/providers/heroku

  • Provider statusVoltage Park: status is acquired

    Lightning AI's blog post of 2026-01-21 says Lightning AI and Voltage Park have merged; Voltage Park's own post is dated only January 2026. The combined company operates under the Lightning AI name.

    Source (opens in a new tab)/providers/voltage-park

  • Provider statusTensorDock: status is acquired

    Voltage Park announced on 2025-03-26 that it acquired TensorDock; the TensorDock site and docs are still online. Voltage Park later merged into Lightning AI.

    Source (opens in a new tab)/providers/tensordock

  • Provider statusEquinix Metal: status is deprecated

    Equinix announced end-of-sale and end-of-life of Equinix Metal on 7 November 2024; the service ended on 30 June 2026 and Metal user documentation was removed on 1 October 2026.