Skip to content

Guide

Cloud service retirements in 2026, and what ends next

24 cloud services, plans, GPUs and regions retire in 2026 and 24 more by mid-2027. Who gives 12 months of notice, who gives 90 days, from providers' own pages.

Author
By the CloudCompare team, FiftySeven
Published
Reading time
9 min read

24 cloud services, server plans, GPU types and regions have retirement dates in 2026 in our records, from 17 providers. 19 of those dates have passed; the last five fall between 30 November and 31 December 2026. Another 19 are scheduled for the first half of 2027, so 24 retirements land between now and 30 June 2027.

The warning is spread far less evenly than the dates. AWS and Google gave a year of notice for nearly every retirement in our data. Netlify gave 90 days for its Visual Editor, and Deno gave six months for its whole hosting platform. The size of the provider tells you more about your lead time than the size of the service.

We track 84 dated retirements from 28 providers on the retirement calendar. Each entry quotes the provider's own deprecation page, changelog or announcement, links to it, and records the date we last compared the quote with the page. The data below was checked on 17 November 2026.

Which cloud services retired or are scheduled to retire in 2026?

Equinix Metal, AWS App Mesh, Amazon Pinpoint, three Azure VM series, Google Cloud's P100 GPUs and the Zeabur platform are the largest. Grouped by what you would have to migrate, the 24 entries for 2026 are:

CategoryWhat retires in 2026Date
Bare metal and platformsEquinix Metal30 June
Bare metal and platformsHostinger OpenVZ VPS plans14 December
Bare metal and platformsZeabur dedicated servers and shared clusters31 December
RegionsNeon Azure regions (deprecated, no new projects)7 April
RegionsAkamai Distributed Compute regions31 December
Instance familiesHetzner CPX11 to CPX51 and CX22 to CX52 (end of sale)1 January
Instance familiesAzure DCsv2 confidential VMs30 June
GPUsGoogle Cloud NVIDIA P10015 September
GPUsAzure NVv3 and NVv4 (AMD Radeon Instinct MI25)30 September
Managed databasesHeroku Apache Kafka 2.8 and 3.728 October
Managed databasesDigitalOcean Managed MySQL 8.030 October
Managed databasesCivo Managed PostgreSQL 1412 November
Managed databasesDigitalOcean Standard Edition plans above 4 GiB RAM30 November
APIs and featuresNetlify legacy prerendering17 March
APIs and featuresCloudflare AMP and Signed Exchanges23 June
APIs and featuresCloudflare Gateway Audit SSH rules15 July
APIs and featuresAWS App Mesh30 September
APIs and featuresAmazon Pinpoint30 October
APIs and featuresRunpod REST API v115 November
Images and runtimesVultr Ubuntu 25.04 image15 January
Images and runtimesVercel Node.js 20 for Builds and Functions1 October
Images and runtimesHetzner Debian 11 image (new servers)30 November

The Hetzner and Azure rows each cover two entries, which is how 22 rows hold 24 retirements. Fourteen of the 24 are whole products, six are instance families, and two each are plans and regions.

Three of these delete data, so missing the date costs more than a migration. Akamai says services left in Distributed Compute regions after 31 December 2026 are permanently deleted, Hostinger removes remaining OpenVZ servers and data, and Heroku restricts and then deletes Kafka clusters past end of life. The Equinix Metal profile and the Zeabur profile keep each provider's own shutdown wording.

How much notice do cloud providers give before a retirement?

The hyperscalers usually give 12 months; smaller platforms ranged from 90 days to almost 20 months. Our records store the effective date, not the announcement date, so we can measure notice only where the provider's own page states both. Where it does:

Provider and serviceAnnounced or deprecatedEndsNotice
AWS WorkMail, RDS Custom for Oracle, WorkSpaces PCoIP, DevOps Guru and othersMarch to September 2026One year later12 months
Google Cloud NVIDIA P10015 September 202515 September 202612 months
Google Cloud NVIDIA P41 August 20261 August 202712 months
Oracle SQL Performance Watch29 January 202629 January 202712 months
Oracle Fleet Application Management6 May 20261 May 2027360 days
Equinix Metal7 November 202430 June 2026Almost 20 months
Hostinger OpenVZ (renewals stopped)1 March 202614 December 2026288 days
Deno Deploy9 October 2026April 2027About 6 months
Netlify Visual Editor10 November 20268 February 202790 days
AWS Infrastructure Composer (console)29 September 20267 December 202669 days

AWS's sunset page (opens in a new tab) says its timeline is "typically 12 months", and every service in its table that we checked on 22 November 2026 runs exactly one year from announcement to end of support except Infrastructure Composer, whose visual editor stays available in the AWS Toolkit for VS Code. Google's Compute Engine deprecations page (opens in a new tab) shows the same one-year gap for both GPU shutdowns.

Version retirements follow the upstream project, so the notice is set by someone else. Vercel disabled Node.js 20 on 1 October 2026, five months after Node.js 20's own end of life on 30 April. Heroku starts forced upgrades a month before each end of life: 28 January 2027 for Postgres 15, ahead of 28 February.

Which retirements have no named replacement?

In 38 of the 84 entries, our record names no replacement, and instance families are the worst: 21 of 27 have none. Products usually point somewhere (AWS App Mesh to Amazon ECS Service Connect, Google Container Registry to Artifact Registry). VM series often just end.

Azure accounts for most of the gap. All 16 of its entries are VM series, and only one, the Av1 retirement in 2024, names a successor in our record. Its 2026 retirements, DCsv2, NVv3 and NVv4, name none. NVv4 shows why this matters: those VMs used AMD Radeon Instinct MI25 GPUs, so the migration is a new GPU, a new VM size and possibly a new driver stack at once. The Azure provider page lists every Azure entry with its quote.

When there is no replacement, size the move yourself. Find current plans with the same vCPU and memory on the spec pages, for example the 16 vCPU, 32 GB plans, or for GPU workloads use the GPU price table to see which cards are on sale today. Our comparison of B200, MI300X and H100 by memory helps when the old card had less memory than anything current.

What retires next, in the first half of 2027?

19 entries are dated between 1 January and 30 June 2027, and they cluster around three dates. Three fall on 31 March, three on 31 May, and two each on 29 January, 30 April and 30 June:

  • 29 January 2027: Oracle ends MySQL HeatWave support and SQL Performance Watch in OCI Database Management.
  • February 2027: Netlify Visual Editor (8 February), Hetzner's Fedora 43 image for new servers (12 February), Google Vertex AI Feature Store Legacy (17 February), Heroku Valkey 7 (19 February) and Heroku Postgres 15 (28 February).
  • 31 March 2027: Amazon WorkMail, Amazon RDS Custom for Oracle, and Azure's Msv2 and Mdsv2 Medium Memory sizes.
  • April 2027: Deno Deploy, Amazon Q Developer IDE plugins (30 April) and the Heroku-22 stack (30 April).
  • 1 May 2027: Oracle OCI Fleet Application Management.
  • 31 May 2027: Azure HBv2 and HC HPC VMs and NP-series FPGA VMs.
  • 30 June 2027: Amazon WorkSpaces PCoIP and Google Cloud Deployment Manager.

The largest single item just outside that window is Google Cloud's NVIDIA T4. Google ends support for T4 GPUs on 1 August 2027 and shuts down remaining resources, recommending its G2 or G4 series, according to its T4 end of support notice (opens in a new tab). Other clouds still rent the T4, and our T4 price page lists where.

Further out, Azure has dated the end of whole VM families that many accounts still run: D, Ds, Dv2 and Dsv2 on 1 May 2028, and Av2, Amv2, B-series v1 and Lsv2 on 15 November 2028.

Which categories retire most often?

Managed database versions and GPU types retire on the most predictable schedule; whole platforms retire with the least warning. Across all 84 entries, 49 are products, 27 instance families, 5 plans and 3 regions. By provider, Azure has 16 entries, AWS 9 and Heroku 8, and most small platforms have one or two.

The pattern by category:

  1. Database and runtime versions follow upstream end-of-life dates, so you can predict them years ahead from the PostgreSQL, MySQL or Node.js release calendars.
  2. GPU and VM generations retire on the hyperscaler's own clock, with about a year of notice and often no named successor.
  3. Platforms and whole products retire when a business changes: Equinix exited bare metal, Zeabur is winding down, Deno Deploy is closing after its announcement on 9 October 2026. These are the ones with 3 to 6 months of notice.

The third group is the one to plan for, because a shutdown is the most expensive price change there is. Our tracker of 2026 cloud price increases covers the price side of the same year.

How can engineering teams track cloud retirements without checking every vendor page?

Subscribe once and let the dates come to you. The site gives you three ways, none of which needs an account:

  1. Calendar: add the retirements calendar file to Google Calendar, Outlook or Apple Calendar, and every dated retirement shows up on its date.
  2. Feed: the change log has an Atom feed of provider announcements and catalog changes.
  3. Lockfile: save the plans you run in a stack lockfile. When you open it again it flags retirement notices that name those plans, along with price moves.

Each provider's profile also lists its upcoming retirements, so the DigitalOcean page shows its MySQL 8.0 and Standard Edition changes next to its prices. How entries are sourced and re-checked is on the methodology page, and other analysis is on the guides page.

In our data a hyperscaler retirement comes with a year's notice, and a small platform's can come with three months.

Questions and answers

Which major cloud services shut down in 2026?
Equinix Metal ended on 30 June 2026. AWS ended support for App Mesh on 30 September and for Amazon Pinpoint on 30 October. Azure retired its DCsv2, NVv3 and NVv4 VM series, Google Cloud ended P100 GPU support on 15 September, and Zeabur shuts down its dedicated servers and shared clusters by 31 December 2026.
How much notice do cloud providers give before retiring a service?
The hyperscalers usually give 12 months. AWS's sunset page says its timeline is typically 12 months, and Google's P100 and P4 GPU shutdowns came exactly a year after deprecation. Smaller platforms give less: Netlify gave 90 days for Visual Editor and Deno Deploy six months, while Equinix gave almost 20 months for Metal.
Where does CloudCompare get its retirement dates?
From each provider's own deprecation page, changelog, release notes or announcement. Every entry stores a verbatim quote of up to 250 characters, the source URL and the date we last compared the quote with the page. The current data was checked on 17 November 2026.
What should I do when a provider names no replacement?
Treat it as a migration you have to plan yourself. In 38 of the 84 entries we track, the record names no replacement, including 21 of the 27 instance family retirements. Check the provider's retirement page for sizing guidance, then compare current plans of the same size on the spec pages.
Can I follow new retirement notices without checking every vendor blog?
Yes. The retirement calendar is available as an .ics file you can subscribe to in any calendar app, the change log has an Atom feed, and a stack lockfile flags retirements that name the plans you saved.

Sources

Figures are read from these provider pages and from the sourced tables on this site.

  1. AWS services in sunset (opens in a new tab)
  2. Google Compute Engine deprecations (opens in a new tab)
  3. Google Cloud NVIDIA T4 end of support (opens in a new tab)
  4. Equinix: goodbye Metal (opens in a new tab)
  5. Azure NVv4-series retirement (opens in a new tab)
  6. Azure NVv3-series retirement (opens in a new tab)
  7. AWS App Mesh user guide (opens in a new tab)
  8. Netlify Visual Editor deprecation (opens in a new tab)
  9. Oracle Cloud Infrastructure service changes (opens in a new tab)
  10. Hostinger OpenVZ to KVM migration (opens in a new tab)
  11. Zeabur is shutting down (opens in a new tab)
  12. Akamai regions (Distributed Compute retirement) (opens in a new tab)
  13. Hetzner Cloud changelog (opens in a new tab)

Spotted a number that is out of date? Tell us on the contact page and we will correct it. How we collect and check prices is on the methodology page.